遼寧大連陳總于2019年年底采購中鑄機械1000mm X 850mm 大型砂箱非標尺寸全自動造型機用于井蓋井圈鑄造造型生產,由于疫情影響,2020年4月份到中鑄機械驗收設備,2020年5月月底正式安裝調試完畢開始投入使用,上圖拍攝記錄于中鑄機械技術人員調試期間。造型機完成砂型造型后將砂型推送至升降機的底板小車上,再經升降機上的氣缸推送底板小車往尾部傳送。
At the end of 2019, Mr. Chen, Dalian, Liaoning Province, purchased a 1000mm x 850mm large-scale non-standard full-automatic sand box molding machine for the casting production of well covers and well collars. Due to the impact of the epidemic situation, the equipment will be inspected and accepted by the casting machinery in April 2020, and will be put into use after the formal installation and commissioning at the end of May 2020. The photo above is recorded during the commissioning by the technicians of the casting machinery. After the molding machine completes the sand molding, it will push the sand mold to the bottom plate trolley of the elevator, and then push the bottom plate trolley to the tail through the air cylinder on the elevator.
由于場地的限制與客戶要求重新利用環形線作為澆注及傳送輔線,砂型經由底板小車傳送后經過另外的氣缸推送至環形線的平臺小車上,經過不斷的循環傳送擺放后澆注冷卻
Due to the limitation of the site and the customer's requirement to reuse the circular line as the auxiliary line for pouring and conveying, the sand mold is transmitted through the bottom plate trolley and then pushed to the platform trolley of the circular line through another cylinder. After continuous circular transmission and placement, the mold is poured and cooled
全自動造型機壓實造型后的井蓋造型效果圖片(下砂箱圖片和上砂箱圖片)
Picture of well cover molding effect after full-automatic casting molding machine compaction molding (picture of lower sand box and picture of upper sand box)
經過造型機鑄造造型生產出來的鑄件產品效果圖片,鑄件將出口東南亞國家!
Casting product effect picture produced by casting molding machine, casting will be exported to Southeast Asian countries!
遼寧大連陳總于2019年年底采購中鑄機械1000mm X 850mm 大型砂箱非標尺寸全自動造型機用于井蓋井圈鑄造造型生產,由于疫情影響,2020年4月份到中鑄機械驗收設備,2020年5月月底正式安裝調試完畢開始投入使用,上圖拍攝記錄于中鑄機械技術人員調試期間。造型機完成砂型造型后將砂型推送至升降機的底板小車上,再經升降機上的氣缸推送底板小車往尾部傳送。
At the end of 2019, Mr. Chen, Dalian, Liaoning Province, purchased a 1000mm x 850mm large-scale non-standard full-automatic sand box molding machine for the casting production of well covers and well collars. Due to the impact of the epidemic situation, the equipment will be inspected and accepted by the casting machinery in April 2020, and will be put into use after the formal installation and commissioning at the end of May 2020. The photo above is recorded during the commissioning by the technicians of the casting machinery. After the molding machine completes the sand molding, it will push the sand mold to the bottom plate trolley of the elevator, and then push the bottom plate trolley to the tail through the air cylinder on the elevator.
由于場地的限制與客戶要求重新利用環形線作為澆注及傳送輔線,砂型經由底板小車傳送后經過另外的氣缸推送至環形線的平臺小車上,經過不斷的循環傳送擺放后澆注冷卻
Due to the limitation of the site and the customer's requirement to reuse the circular line as the auxiliary line for pouring and conveying, the sand mold is transmitted through the bottom plate trolley and then pushed to the platform trolley of the circular line through another cylinder. After continuous circular transmission and placement, the mold is poured and cooled
全自動造型機壓實造型后的井蓋造型效果圖片(下砂箱圖片和上砂箱圖片)
Picture of well cover molding effect after full-automatic casting molding machine compaction molding (picture of lower sand box and picture of upper sand box)
經過造型機鑄造造型生產出來的鑄件產品效果圖片,鑄件將出口東南亞國家!
Casting product effect picture produced by casting molding machine, casting will be exported to Southeast Asian countries!